2017/2018 Capital Improvement Projects
 
ONAGA TRAIL ROW PROJECT, PROJECT #7005
The Town has been awarded grant funds through the Active Transportation Program (ATP). The project involves the the installation of traffic safety improvements on Onaga Trail. The grant provides funding to install curb, gutter, sidewalk and pavement widening on both sides of Onaga Trail from approximately Grand Avenue to Acoma Trail.
icon Onaga Trail Design Concept
 
YUCCA TRAIL SAFETY IMPROVEMENTS, PROJECT #8971
The Town has been awarded grant funds through the HSIP. The project involves the the installation of traffic safety improvements on Yucca Trail. Yucca Trail, from Warren Vista Avenue to Avalon/Palomar Avenue. Widening Yucca Trail by providing an 8 foot shoulder on both sides. 2-12’ travel lanes. 12 foot center striped median with left turn movements into the intersections of Warren Vista, Bonita, Chula Vista, Victoria, Alaba, Frontera, Balsa, Emerson, Hanford, La Habra, Rubidoux, and Palomar. Widening of Warren Vista both north and south of Yucca Trail to include left hand turn and through lanes. In addition to the improvements to the similar intersection improvements at Yucca Trail and Palomar.
icon Yucca Trail Design Concept
 
WARREN VISTA AVENUE/YUCCA TRAIL IMPROVEMENTS PROJECT #8971
The project proposes widening and left turn lanes on Warren Vista Avenue and Yucca Trail as determined through the completion of the Yucca Trail Safety and Circulation Analysis.  Construction will not begin until after the HDWD Sewer Collection Project is completed.
iconWarren_Vista_Map
PALOMAR AVENUE/YUCCA TRAIL INTERSECTION IMPROVEMENTS PROJECT #8969

The project proposes widening, signal modifications and turn pocket striping on Palomar Avenue as determined through the completion of the Yucca Trail Safety and Circulation Analysis.  Construction will not begin until after the HDWD Sewer Collection Project is completed.

iconPalomar_Intersection_Map
 
 

YUCCA VALLEY ELEMENTARY SCHOOL SIDEWALKS PROJECT #8967

The Town has been awarded grant funds through the Active Transportation Program (ATP).  The project is for construction of sidewalks, curb, gutter, handicapped ramps and driveway approaches on both the north and south sides of Pueblo Trail between Hopi Trail and Bannock Trail.

iconYV_Elementary_Improvements_Map
 

SR62 TRAFFIC CONTROL SYNCHRONIZATION (PHASE II) PROJECT #8028

The Town has been awarded federal grant funds through the Congestion Mitigation and Air Quality Program (CMAQ).  The project consist of synchronizing traffic signals on SR62 and the intersections of Sage Avenue, Dumosa Avenue, SR247, Airway Avenue, Warren Vista Avenue, Balsa Avenue, Hilton Avenue, Avalon Avenue, Home Depot, and Yucca Mesa/La Contenta Road.  The purpose of the project is to mitigate and reduce traffic congestion and delay through improved traffic signal timing, improve traffic flow and reduction in idling time resulting in improved air quality. 

iconCMAQ_Map
 
TOWN PROPERTY PHASE I SEWER CONNECTION PROJECT #2935
The project involves the design of wasterwater connections and the construction to hookup Town owner property to the new sewer system.  Phase I Town owned property areas include the Community Center/Town Hall Complex, Community Development/Public Works building, RDA property, PFF building, Welcome Center, Paradise Park, Jacobs Park, Brehm Park and other various locations.
iconPhase_I_Sewer_Connection_Map
 
CRACK SEALING PROJECT PROJECT #7037

The Town Wide Crack Seal Project is a maintenance effort that is a part of the Town’s overall pavement maintenance program. Crack sealing is the first step to be implemented prior to the slurry seal of the streets. The maintenance effort is implemented to extend the lifetime of the roadway pavement throughout the Town prior to roads deteriorating to the degree where road reconstruction is necessary. The Crack Seal Project generally consists of applying a crack sealant to the cracks in the pavement, to assist in reducing and eliminating water penetration into and below the asphalt roadway. This process is best completed in winter months followed by slurry seal in the summer months. Temperatures for both treatments are important for satisfactory results.

iconCrack Sealing Schedule (February-March)
 
PARADISE PARK PROJECT PROJECT #8947

The Paradise Park Improvement Project included the following improvements.

  • Turf installation;
  • Irrigation systems;
  • Replacement doors and access control electronics at existing restroom building;
  • Rough and precise grading
  • Limited fencing replacement
 
 
PFF BUILDING PROJECT PROJECT #8965
The PFF Building Project is a improvement project aimed at converting the old PFF bank building into the new Yucca Valley Library. The library will feature a revised floor plan and building rennovations.
iconPFF Building Site Map
 
2018/2019 MEASURE I TOWN WIDE SLURRY SEAL PROJECT #8340

Installation of slurry seal/cape seal, hot mix asphalt repairs and replace street striping, markings and legends on designated streets.

 
 
2018/2019 MEASURE Y TOWN WIDE SLURRY SEAL PROJECT #7006 thru 7036

Installation of slurry seal/cape seal, hot mix asphalt repairs and replace street striping, markings and legends on designated streets.

 
YUCCA MESA, BARRON RD. TO TOWN LIMIT PROJECT #7003

Pavement rehabilitation of Yucca Mesa Road from SR62 to Town Limit.SR62 to northern Town limit. Pavement Rehabilitation is complete.

 

 

BUENA VISTA, SR247-YUCCA MESA PROJECT #7002

Pavement rehabilitation of Buena Vista between SR247 to Yucca Mesa Road. Pavement Rehabilitation is complete.
iconSchedule
 

BUENA VISTA & YUCCA MESA RD. INTERSECTION IMPROVEMENTS PROJECT #7004

Pavement rehabilitation.
 
 
SR62: SR247 TO WARREN VISTA AVE. ROW STUDY PROJECT #7000
Professional Design Services to widen SR62 from 4 lanes to 6 lanes.
 

BREHM PARK IMPROVEMENT PROJECT PROJECT #8964

Funding to complete the finishing elements at the Town’s newest park facility. Includes items such as security, signage, landscaping along Palm, interior building equipment for public use, electrical access to amphitheater, and storage facility improvements.
 
 

EMERGENCY GENERATOR – ANIMAL SHELTER PROJECT #5002

The Town received an allocation of $262,051 in HMGP funds for the installation of a Backup Emergency Generator at Town Hall and Animal Shelter. Federal standards require competitive bidding for the expenditures of HMGP funds. Installation of the generators is currently underway.
 

PFF DESIGN & RENOVATION AND CV CHARGE STATION PROJECT #8965

Design and Renovation including CV Charge Station.
 
 

OLD KENNEL & ELK TRAIL DEMOLITION PROJECT #8045-8054

Demolition of all structures and slabs, removal of all appurtenances and debris, including septic/sewer system, and abatement of asbestos. Demolition is complete.

iconBid Results
 
TOWN-WIDE SLURRY SEAL PROJECT 2018/19

The Town-Wide Slurry Seal Project is an annual maintenance effort that is a part of the Town’s overall pavement maintenance program. The annual maintenance effort is implemented to extend the lifetime of the roadway pavement throughout the Town prior to roads deteriorating to the degree where road reconstruction is necessary.

iconSchedule Yucca Valley