EP 68-18          
EP 67-18          
EP 66-18 SO CAL GAS 10/26/18 12/07/18 9220 HERMOSA AVE INSTALL NEW BUSINESS SERVICE
EP 65-18          
EP 64-18          
EP 63-18          
EP 62-18 SO CAL GAS 09/07/18 09/07/18 7130 SAGE AVE LEAK REPAIR
EP 61-18 FRONTIER 09/21/18 12/21/18 YUCCA TRAIL PROVIDE SERVICE TO CUSTOMER
EP 60-18          
EP 59-18 SO CAL GAS 08/31/18 10/31/18 58370 BONANZA DRIVE INSTALL NEW BUSINESS SERVICE
EP 58-18          
EP 57-18 SCE 10/10/18 10/25/18 YUCCA MESA RD REMOVE TWO PILOT WIRES
EP 56-18 SPECTRUM 08/20/18 08/24/18 YUCCA TRAIL FOM PALOMAR AVE TO ONAGA TRAIL REPLACE FIBER OPTIC CABLE
EP 55-18 SO CAL GAS 08/08/18 10/08/18 8531 FRONTERA AVE INSTALL NEW BUSINESS SERVICE
EP 54-18 FAITH ELECTRIC 07/26/18 08/15/18 YUCCA MESA RD AND BARRON DR; YUCCA MESA RD AND BUENA VISTA DR REPLACING UTILITY POLES
EP 53-18 PAVEMENT COATINGS

07/30/18

08/17/18 YUCCA MESA RD / LA CONTENTA RD SLURRY AND CHIP SEAL
EP 52-18 HDWD / SUKUT 10/05/18 09/30/20 TOWN-WIDE SEWER PACKAGE 'D
EP 51-18 SO CAL GAS 07/16/18 09/16/18 57037 29 PALMS HWY ABANDON SERVICE
EP 50-18 MATICH CORP 08/01/18 09/30/18 BUENA VISTA PAVING STREET WIDENING
EP 49-18 SO CAL GAS 07/10/18 09/10/18 7361 HOPI TRAIL NEW BUSINESS INSTALLl; (1) 3'x3' ASPHALT CUT
EP 47-18 FAITH ELECTRIC 07/03/18 09/03/18 GOLDEN BEE AND ACOMA TRAIL REPLACE UTILITY POLE
EP 46-18 SO CAL GAS 06/28/18 08/28/18 7454 ELK TRAIL LEAK REPAIR
EP 45-18 SO CAL GAS 06/25/18 08/25/18 57844 IVANHOE DR NEW BUSINESS INSTALL IN EARTH
EP 44-18 SCE 06/15/18 08/15/18 ASTER AND PUEBLO UPGRADE POLES, WIRES, AND EQUIPMENT
EP 43-18 WEKA INC 06/13/18 08/13/18 TOWNWIDE EVALUATE EXISTING SOIL CONDITIONS
EP 42-18 SCE 06/14/18 08/14/18 54551 PINON CT REPLACE SCE POLE #341655S
EP 41-18 FRONTIER CALIFORNIA INC 06/11/18 08/11/18 CHEROKEE TRAIL AND YUCCA TRAIL EXCAVATE EXISTING SPLICE POINT TO REMOVE BRIDGE TAP TO PROVIDE SERVICE TO A CUSTOMER
EP 40-18 VSS INTERNATIONAL INC 06/07/18 08/30/18
TOWN WIDE
TOWN-WIDE SLURRY SEAL PROJECT 2018/19
EP 39-18 SO CAL GAS 06/04/18 08/24/18 8807 FRONTERA AVE NEW SERVICE INSTALL
EP 38-18 SCE 06/04/18 08/04/18 PAXTON RD AND RED BLUFF AVE REPLACE POLE #2232259E
EP 37-18 WASHINGTON 05/31/18 07/31/18 57157 JUAREZ TRAIL REPLACE OLD CONCRETE APPROACH
EP 36-18 SO CAL GAS 06/14/18 08/18/18 7715 SAGE AVE REPLACE 2" PIPE AND SERVICE REPLACEMENTS
EP 35-18 MANHOLE ADJUSTING, INC 05/24/18 07/02/18 YUCCA TRAIL/ ALTA LOMA DRIVE. ABERDEEN TRAFFIC CONTROL
EP 34-18 SO CAL GAS 05/23/18 08/14/18 57273 ONAGA TRAIL RECTIFIER, WELL(3), AND ANODE(2) INSTALL
EP 33-18 SO CAL GAS 05/14/18 08/08/18 57732 SAN TROPEZE DR NEW BUSINESS INSTAL; 3' X 3' EARTH CUT IN PUBLIC PROPERY
EP 32-18 SO CAL GAS 05/14/18 08/08/18 57858 29 PALMS HWY NEW BUSINESS INSTALL; 4' X 2' ASPHALT CUT IN STREET
EP 31-18 SO CAL GAS 05/01/18 07/23/18 7562 CIBOLA TRAIL SERVICE INSTALL
EP 30-18 COCHRAN 04/25/18

04/27/18

58923 BUSINESS CENTER DR TRENCH 50' BEHIND CURB ON SOUTH SIDE OF STREET. INSTALL CAT5 CONDUIT
EP 29-18 ANGELA RUBALCAVA        
EP 27-18 RICHARD LLEWELLYN 04/18/18 04/30/18 7584 DUMOSA AVE NEW DRIVEWAY
EP 26-18

EUGENE SMITH

04/19/18 04/30/18 54655 NAVAJO TRAIL INSTALLING CONDUIT
EP 25-18 SO CAL GAS 04/10/18 07/10/18 57460 ENCELIA DR 3'x3' Asphalt cut in street; Service Replacement
EP 24-18 SO CAL GAS 04/01/18 07/01/18 7155 BARBERRY AVENUE INSTALL 2 X 20LB ANODES
EP 23-18 SO CAL GAS 03/27/18 06/27/18 58150 LISBON DRIVE NEW SERVICE INSTALL
EP 21-18 HDWD
04/06/18
08/19/19

PHASE 1 -

PACKAGE C

CONSTRUCTION OF SEWER COLLECTION SYSTEM INCLUDING SEWER LINES, MANHOLES, CLEANOUTS, LATERALS, FORCE MAINS, AC PAVING, DRILL AND BORE OPERATIONS, IN ACCORDANCE WITH THE PLANS & SPECIFICATIONS PREPARED FOR HDWD'S WASTEWATER PROJECT.
EP 20-18 SO CAL GAS
03/20/18
05/20/18

54665 NAVAJO TRAIL

INSTALL NEW BUSINESS SERVICE

EP 19-18 SCE
04/02/18
06/30/18
SAGE AVENUE
REMOVE & REPLACE 6 DETERIORATED TRANSMISSION POLES 3 LOCATED INSIDE PRIVATE PROPERTY
EP 18-18
MICHAEL BAKER INERNATIONAL
02/20/18
06/03/19
TOWN WIDE
SURVEY ONLY
EP 17-18
SCE
03/01/18
06/01/18
56312 ONAGA TRAIL
REMOVE & REPLACE DETERIORATED TRANSMISSION POLE #4036138E
EP 16-18
CADD WORKS
02/06/18
02/08/18
58360 NAVAJO TRAIL
APPROACH AND DRIVEWAY
EP 15-18
Frontier California Inc
02/15/18
05/15/18

7246 & 7237

MURRAY LANE

EXCAVATE (2) SPLICE PITS AND REMOVE BRIDGE TAPS

EP 14-18
AMERICAN ASPHALT SOUTH
02/26/18
03/26/18
TOWN WIDE
CRACK SEALING
EP 13-18
SO CAL GAS
02/05/18
04/05/18
7531 CHEROKEE TRAIL
NEW SERVICE INSTALL
EP 12-18
SO CAL GAS
01/29/18
03/29/18
56433 ANTELOPE TRAIL
INSTALL (2) #20 ANODES, 3X4 EARTHCUT
EP 11-18
SO CAL GAS
01/29/18
03/29/18
56367 ANTELOPE TRAIL
INSTALL (2) #20 ANODES, 3X4 EARTHCUT
EP 10-18
SO CAL GAS
01/29/18
03/29/18
7067 TAMARISK AVE
INSTALL (2) #20 ANODES, 3X4 EARTHCUT
EP 09-18
SO CAL GAS
01/29/18
03/29/18
8138 GRAND AVE
INSTALL (2) #20 ANODES, 3X4 EARTHCUT
EP 08-18
SO CAL GAS
01/29/18
03/29/18
7048 CHOLLA AVE
INSTALL (2) #20 ANODES, 3X4 EARTHCUT
EP 06-18
SCE
1/16/18
04/05/19

ONAGA TRAIL W/O JEMEZ TRAIL

REMOVE AND REPLACE DETERIORATED POLES
EP 05-18

SUKUT CONSTRUCTION LLC

1/10/18
03/30/19
CENTRAL YUCCA VALLEY
SURVEY ONLY
EP 03-18
SO CAL GAS
12/28/17
02/28/18
56763 PIUTE TRAIL
INSTALL (2) #20 ANODES, 3X4 EARTHCUT
EP 02-18
SO CAL GAS
12/26/17
02/26/18

57915 JOSHUA LANE

INSTALL NEW BUSINESS, (2) 3X3 EARTHCUT
EP 01-18
SO CAL GAS
1/02/17
3/02/18
7575 HILTON AVENUE
INSTALL NEW BUSINESS, 3X3 EARTHCUT & 3X3 ASPHALT